Difference between revisions of "Dry Board"
From Salem Wiki
(Added actual information, figured it was useful rather than having to open up the timber pile page to see what to do) |
(Added actual information, figured it was useful rather than having to open up the timber pile page to see what to do) |
(No difference)
|
Revision as of 06:52, 3 April 2013
About
A Dry Board is created by building a Timber Pile and letting it dry for 133 hours(5 Days, 13 Hours). Dry boards can then be taken from the Timber Pile. Timber Piles will likely generate Moldy Boards if not placed properly (At east 5 tiles away from any other object, except Tilled Fields)