Difference between revisions of "Trial by Fire"
Line 9: | Line 9: | ||
==About== | ==About== | ||
− | A {{i|Trial by Fire}} is an aggressive structure used to allow for Acts of [[Waste]] to be committed against land | + | A {{i|Trial by Fire}}, commonly known as a "TBF", is an aggressive structure used to allow for Acts of [[Waste]] to be committed against land claimed by a {{i|Town Bell}}. To build a Challenge Authority you must be a Citizen of a [[Town Bell|Town Claim]] as well as have the "Manage Claims" right within that Town. |
− | + | <onlyinclude>{{#ifeq:{{{transcludesection|tbf}}}|tbf| | |
==Besieging a Town== | ==Besieging a Town== | ||
− | + | Acts of Waste cannot normally be committed on land protected by a Town Claim unless a {{i|Trial by Fire}} is first built. A Trial by Fire projects a shadow approximately 500x tiles wide on either side and 1000x tiles forward from the Trial by Fire's front. This means that the area directly behind a Trial by Fire is '''NOT''' covered by its shadow. Act of Waste can be committed on any tiles under its shadow. '''NOTE:''' Acts of Waste committed on land covered by a Trial by Fire still are {{i|Crime!}}s and will leaves {{i|Scent}}s, [[Evidence]], and trigger nearby [[Brazier Forging|Aggressive Defense Structures]]. | |
− | |||
− | |||
− | |||
− | '' | ||
− | |||
− | |||
− | |||
− | |||
+ | Once built, a Trial by Fire must age for 24 hours, unless the Town Claim under its shadow is less than a week old, before Waste can be committed. Once constructed, a Trial by Fire can '''NOT''' be {{i|Destroy}}ed until 20 hours have passed, 4 hours before the Trial begins. Once a Trial by Fire is Destroyed, the Trial ends and Waste can no longer be committed against that Town until another Trial by Fire has been built. A Trial by Fire drains 40 Authority per hour from the Town Bell of the pilgrim who built it. | ||
+ | }}</onlyinclude> | ||
[[File:Wasteclaim.png]] | [[File:Wasteclaim.png]] | ||
|} | |} |
Revision as of 03:09, 9 November 2020
|
Trial by Fire |
---|
AboutA Trial by Fire, commonly known as a "TBF", is an aggressive structure used to allow for Acts of Waste to be committed against land claimed by a Town Bell. To build a Challenge Authority you must be a Citizen of a Town Claim as well as have the "Manage Claims" right within that Town. Besieging a TownActs of Waste cannot normally be committed on land protected by a Town Claim unless a Trial by Fire is first built. A Trial by Fire projects a shadow approximately 500x tiles wide on either side and 1000x tiles forward from the Trial by Fire's front. This means that the area directly behind a Trial by Fire is NOT covered by its shadow. Act of Waste can be committed on any tiles under its shadow. NOTE: Acts of Waste committed on land covered by a Trial by Fire still are Crime!s and will leaves Scents, Evidence, and trigger nearby Aggressive Defense Structures. Once built, a Trial by Fire must age for 24 hours, unless the Town Claim under its shadow is less than a week old, before Waste can be committed. Once constructed, a Trial by Fire can NOT be Destroyed until 20 hours have passed, 4 hours before the Trial begins. Once a Trial by Fire is Destroyed, the Trial ends and Waste can no longer be committed against that Town until another Trial by Fire has been built. A Trial by Fire drains 40 Authority per hour from the Town Bell of the pilgrim who built it. |
|